Selby Swing Bridge
This project was to construct previously fabricated pieces of a swing bridge at the riverside. Once constructed, the structure needed to be slid into position. Leven Bridge Engineers managed the onsite project on time, safely and to the exacting quality standards required for such a structure.Visit the Leven Bridge Engineering Ltd website for more information on Selby Swing Bridge