Calendar Scheduling of Work Orders in 9.2.6
27-05-2015
The release of MR 9.2.6 comes with an added bonus in the form of significant enhancements to the Scheduling Calendar. In versions previous to this release, schedule administrators could only assign work order items to techs or groups and place them on the calendar. This latest release builds upon that core function to allow much greater functionality:
Schedule start and stop times for entire work orders
Assign an entire work order to a user or group, not just line items
View the entire year in the Calendar View
View the entire schedule with the new Timeline View
Create custom layouts for the Calendar View to include additional details about the scheduled work
Export the calendar views to popular formats
Synchronize the Calendar with Outlook, or import/export ICS files
Easily navigate through months, weeks, or years with enhanced calendar navigators
Create color schemes for items shown in the calendar view
Add ad-hoc events not related to the Order System
Span scheduled events across multiple days complete with drag and drop editing
Do we have your attention now? We thought so. Let’s take a look at most of these mentioned features, then we’ll send you over to my.indysoft.com to login and download the latest release.
Scheduling Work Orders
Of all the feedback from our customers, the ability to schedule an entire work order to a staff member or group along with start and end dates for the job was among our top requests.
Scheduling of a work order is found on the bottom left of the Calendar view right alongside the scheduling of work order line items. Simple select a tech or group from the top right, then drag the order into the calendar view.Visit the IndySoft Europe Ltd website for more information on Calendar Scheduling of Work Orders in 9.2.6